PDA

View Full Version : SingTel EXPAN UPS Maintenance Activity


choon
02-07-2008, 04:43 PM
Dear valued customers,

SingTel EXPAN will be conducting Cyclical UPS Parts (Capacitors and Fans) Replacement in accordance to guidelines set by UPS manufacturer;

Commencement Date/ Time

15-03-08/ 1700hrs (SGT) to 16-03-08/ 0930hrs (SGT)

Purpose of Works

Following the recommended cyclical parts replacement guidelines set by the UPS manufacturer, the AC/DC capacitors and fans for the UPS 5-1 and 6-1 have to be replaced. This would ensure that the performance of UPS 5-1, 6-1 (1+1 setup - function as a pair) is maintained within specifications.

Impact on Services

During the implementation work, the customer load on the UPSes will be transferred to external maintenance bypass.
In this instance, Customer’s load will be supported by Raw power from the PowerGrid which are back-up by the building generator supply during the replacement works.
In the event that the raw power supply from the grid is disrupted, customer’s load on single power feed supply (A source/power strip) will be affected.
Customers are advised to backup your critical data or divert your critical services before the implementation period where necessary.

Sorry for any inconvenience caused.

Thanks.

choon
07-10-2008, 07:29 PM
Dear valued customers,

SingTel EXPAN will be conducting Cyclical UPS Parts (Capacitors and Fans) Replacement in accordance to guidelines set by UPS manufacturer;

Commencement Date/ Time

16-08-08/ 1700hrs (SGT) to 17-08-08/ 0730hrs (SGT)

Purpose of Works

Following the recommended cyclical parts replacement guidelines set by the UPS manufacturer, the AC/DC capacitors and fans for the UPS 5-1 and 6-1 have to be replaced. This would ensure that the performance of UPS 5-1, 6-1 (1+1 setup - function as a pair) is maintained within specifications.

Impact on Services

During the implementation work, the customer load on the UPSes will be transferred to external maintenance bypass.
In this instance, Customer’s load will be supported by Raw power from the PowerGrid which are back-up by the building generator supply during the replacement works.
In the event that the raw power supply from the grid is disrupted, customer’s load on single power feed supply (A source/power strip) will be affected.
Customers are advised to backup your critical data or divert your critical services before the implementation period where necessary.

choon
04-08-2009, 02:31 AM
Dear valued customers,

SingTel EXPAN will be conducting Cyclic UPS Parts (Capacitors and Fans) Replacement in accordance to guidelines set by UPS manufacturer.

Commencement Date/ Time

UPS 5-2 - 25 April 2009, 1900hrs to 26 April 2009, 0700hrs (SGT)

UPS 6-2 - 23 May 2009, 1900hrs to 24 May 2009, 0700hrs (SGT)

Purpose of Works

Following the recommended cyclical parts replacement guidelines set by the UPS manufacturer, the AC/DC capacitors and fans for the UPS 5-2 and 6-2 is due for replacement. This would ensure that the performance of UPS 5-2, 6-2 (1+1 setup - function as a pair) is maintained within specifications.

Impact on Services

During the implementation work, the customer load on the UPSes will be transferred to alternate UPS (eg. When working on 5-2, load will be transferred to 6-2).

In this instance, Customer’s load will be supported by ONE ups and back-up by by-pass source (raw power).

Customers are advised to backup your critical data and/or divert your critical services before the implementation period if necessary.